National Commercial Bank
SANA company's mission under the Project (National Commercial Bank Data Center in King Abdullah Economic City) included:
-
Supply BMS and design of Tier4 Data Center in KAEC/KSA, including testing and commissioning with Uptime institute test.
-
Supply DDC panels/Trend Honeywell and IQVISION Supervisor as BMS software.
-
Integration, controlling and monitoring of HVAC, Chilled water system, Generators, and electrical equipment of the data center.
STC Buildings
SANA company's mission under the Project included:
K.AbdulAziz Telecom Complex -STC Buildings 41, 45, 13 DAM
-
Supply BMS and design of energy saving project with Arabian Qudra for three of STC administration buildings (41 & 45 in Riyadh, and building 13 in Dammam) .
-
Supply DDC panels/Trend Honeywell and IQVISION Supervisor as BMS software.
-
Integration, controlling and monitoring with the existing HVAC, Chilled water system, and electrical equipment of each building with calculation of power consumption and energy saving.
-
.Supply and installation of motion sensors for lighting control ckts.
Mecca tunnels project
General description:
This project involves construction of a tunnel to link Mecca with Taif in Saudi Arabia. The project covers the construction of 11 Km tunnel which will start at Khalidiya and end at Al Kar, being connected to Makkah-Taif Expressway, including 2 parallel tunnels, each with 3 lanes; one for upward traffic to Taif and the other for downward traffic to Makkah. The tunnels will have a diameter of 13.5 m, a width of 14 m and a height of 8.7 m.
SANA company's mission under the Project included:
Supply of Rosenberg fan (Axial Jet fans) for the ventilation system
SANA Engineering Group are proud to have completed more than 1500 projects all over the Middle East , to know the full list of projects, contact us